![]() The screenplay was primarily written by Qui Nguyen and Adele Lim with additional contributions from various writers, based on story ideas by Bradley Raymond and Helen Kalafatic. It was directed by Don Hall and Carlos López Estrada, co-directed by Paul Briggs and John Ripa, and produced by Osnat Shurer and Peter Del Vecho. ə/ RYE-ə) is a 2021 American animated fantasy action-adventure film produced by Walt Disney Animation Studios and distributed by Walt Disney Studios Motion Pictures. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.Raya and the Last Dragon ( / ˈ r aɪ. You will need Adobe Acrobat Reader to view some of the files on this page. New discharges may apply at any time, but EPA strongly suggests applying 30 days prior to the date discharges are likely to begin.Įmergency discharges may begin at any time, provided the notification requirements are met, including submitting an NOI no more than 30 days following the start of emergency discharges.Ĭopies of the DRGP and related documents are available through links below. All DGP and RGP permits will be automatically terminated as of March 31, 2023. If you are unable to complete the required forms electronically, please contact to request this waiver to apply.Įxisting discharges covered under the DGP that expired on or the RGP that expired on Apthat have been administratively continued must reapply no later than 90 days following the DRGP effective date. The 2022 DRGP establishes electronic Notice of Intent (NOI), Change (CNOI), and Notice of Termination (NOT) requirements through EPA's NPDES e-reporting tool (NeT), effluent limitations and requirements, standard and special conditions, and best management practice (BMP) requirements for sites that discharge 1.0 million gallons per day or less.ĪLERT: The electronic NOI, NOC and NOT are available through CDX. ![]() The DRGP provides NPDES coverage for discharges that are a result of four types of dewatering and remediation activities: 1) Site remediation 2) Site dewatering 3) Infrastructure dewatering/remediation and 4) Material dewatering for four types of wastewaters: 1) Groundwater 2) Stormwater 3) Potable water and 4) Surface water. ![]() Note: The effective date of the Massachusetts DRGP for the State is August 31, 2022.ĮPA Region 1's Dewatering and Remediation General Permit (DRGP) combines the Dewatering General Permit (DGP) and Remediation General Permit (RGP) for sites located in Massachusetts and New Hampshire, federal facilities in Vermont, and sites located on Indian country lands in Connecticut and Rhode Island. The Final National Pollutant Discharge Elimination System (NPDES) General Permit for Dewatering and Remediation Activity Discharges – the DRGP (2022 DRGP) in Massachusetts (MAG910000) and New Hampshire (NHG910000), federal facilities in Vermont (VTG910000), and Indian country lands in Connecticut (CTG910000) and Rhode Island (RIG910000) was signed and became effective on August 2, 2022.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |